• Skip to primary navigation
  • Skip to main content
  • Skip to footer

GoEV

A goEV incentive is waiting for you.

  • Public Power’s Support
  • Benefits of EVs
  • Find A Charger
  • FAQs
  • Contact Us

Commercial Incentives

Commercial Conduit

EARN A $1,000 INCENTIVE

for new commercial construction conduit for a future public charging station

Apply

100% reimbursement (maximum of $1,000) for new commercial construction for the installation of conduit to be used for the future installation of an electric vehicle public charging station.

Qualifications
  • Available to commercial customers of Nebraska Public Power District and its wholesale utility partners.
  • Commercial conduit installation must take place at a new construction or commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to utility along with cost details and verification of installation.
Guidelines
  • This incentive is for the installation of conduit for use with conductor for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV public charging station.

    Load Requirements (exact requirements may vary):
    — Level 2: Single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.
Next Steps
  • Visit with your electrical utility to discuss your conduit and charging needs and pick up an application form.
  • Submit payment request after purchase and installation.
Additional Information
  • Brochure
Commercial Charger

EARN A 50% REIMBURSEMENT

for the installation of an electric vehicle public charging station.

Apply
  • 50% reimbursement (90% for nonprofit entity) for the equipment and installation of that equipment necessary for a public or workplace electric vehicle charging station (copy of nonprofit needed).
  • The goal of this program is to expand the charging network across the state. Consideration of locations will prioritize these parameters: intersections of major highways, distance from the nearest charging station, availability of 24/7 accommodations, etc.
  • Pre-approval is required for verification of a benefit vs cost analysis.
  • Eligible grants, discounts, etc. are deducted from the total cost to determine the customer’s cost. This amount is eligible for the cost-share.
  • The reimbursement is based on the lower of two qualified bids submitted to the utility.
  • Customers have a limited time to purchase, install and connect charging stations. If this time is exceeded, the incentive will expire 180 days after approval.
Qualifications
  • Available to commercial customers of Nebraska Public Power District and its wholesale utility customers.
  • Only available to non-residential accounts.
  • Public charging station installation must be at a commercial/workplace site.
  • To obtain the incentive, all steps on the application must be completed and submitted to utility along with the two bid proposals and verification of installation.
Guidelines
  • This incentive is for the installation of equipment for minimum ampacity of the following charger loads per the National Electrical Code (NEC) and/or the running of appropriately sized conduit per NEC from the load center to a future EV charging station.

    Load Requirements (exact requirements may vary):
    — Level 2: single phase, 240 volts, 32 amps per port.
    — Level 3 (DCFC): 480V AC, 3-phase, 80A, 60 Hz.
  • Program is subject to Terms and Conditions outlined on the application.
Next Steps
  • Visit with your electrical utility to discuss your charging needs and pick up an application form which includes the approval section.
  • Submit final payment request after purchase and installation.
Additional Information
  • Brochure

Footer

en English
ar Arabiczh-CN Chinese (Simplified)nl Dutchen Englishfr Frenchde Germanit Italianpt Portugueseru Russianes Spanish

Copyright © 2021